Quickstart Guide Trace Oxygen Analyzer
Teledyne Analytical Instruments 10
9. With the O-ring in place, align the guide pin with the hole on the cell holder. Then,
with the holder, lift cell into the cell block.
10. Push the gate on the cell block down so that the slots on the side of the gate engage
the locating screws on the side of the block. This forces the holder into position and
forms a gas-tight seal.
11. Purge the system using sample or zero gas.
12. Power the system back up.
If the installation is carried out quickly enough, the sensor will reach a stable low value less
than 1 ppm in approximately 8 hours or less.