Thermador VCI 230/236/248 DS installation manual Preparing The Cutout, Preparing The Installation

Models: VCI 230/236/248 DS

1 28
Download 28 pages 42.15 Kb
Page 7
Image 7
Step 1: PREPARING THE CUTOUT

BEFORE INSTALLATION

Step 1: PREPARING THE CUTOUT

The wall must be flat and vertical.

Make sure that the wall is capable of providing a firm hold for mounting screws and plugs.

Weight in kg: 24,5.

Step 2: PREPARING THE INSTALLATION

There are two mounting methods:

Installation in wooden framework or Installation with the mounting brackets provided.

– Remove mounting brackets by removing screws

After removing the mounting brackets, the screws must be inserted again.

Preparing the wooden framework

Preparing the installation with mounting brackets

4 x 1/4" holes

PAGE 5

Page 7
Image 7
Thermador VCI 230/236/248 DS Preparing The Cutout, Preparing The Installation, Preparing the wooden framework