MECHANICAL INSTALLATION 110SR

Fig. 4: Pre-installation ring on steel

furring channel prior to drywall

being placed.

Fig. 7: Installing the subwoofer using the ledge to temporarily secure it.

Fig. 5: Cutting drywall using the Rotozip™.

Fig. 8: Attaching the subwoofer to

the pre-installation ring.

Fig. 6: Completed install showing the

reveal of the pre-installation ring

relative to the ceiling board.

Fig. 9: Completed subwoofer detail.

Fig. 11: Rotozip™ showing guidepoint bit.

Fig. 10: Completed subwoofer installation.

Page 13
Image 13
TOA Electronics 110SR owner manual Cutting drywall using the Rotozip