Note: The fgure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the fgure above.

4444 Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indica- tors will respond as follows:

All of the LED indicators will flash momentarily for one second, which represents a resetting of the system.

The Power LED indicator will light up.

17 Connection