17
Smart Switch
Verify Installation212
After completing the installation, please verify the foll owing items:
There are 5~10cm of clearance around the side s of the device for ventilation and
the air flow is adequate.
The voltage of the power supply meets the requirement of the input voltag e of the device.
The power socket, device and rack are well grounded.
The device is correctly connected to other net work devices.
Power On212
Plug in the negative connector of the provided p ower cord into the power socket of the
device, and the positive connector into a power outlet as the following figur e shown.
Connecting to Power SupplyFigure 4-4
Note: The gure is to illustrate the applic ation and principle. The power plug you get
from the pa ckage and th e socket in your situation will comply with the regulation in
your country, so they may differ from the gure above.
Initialization214
After the device i s powered on, it b egins the Power-On Self-Test. A series of tests run
automatically to ensure the device functions prope rly. During this time, its LED indica-
tors will respond as follows:
The Power LED lights on all the time.
After keeping off for several seconds, the LED indicators of all the ports will flash
momentarily and then turn off again after initialization.
The System LED indicator will flash, which represents a succes sful initialization.
Connection