Tricity Bendix TBG 640 manual Building In, Building over a kitchen unit with door, Seal

Models: TBG 640

1 22
Download 22 pages 5.88 Kb
Page 15
Image 15
Building In

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

It is also recommended to carry out the electrical connection to the hob as shown in diagrams 1 and 2.

1

ON/OFF SWITCH

 

FLEX

 

OUTLET

 

FO 0763

 

2

ON/OFF SWITCH

3

 

 

 

60

 

FLEX

 

 

OUTLET

 

FO 0764

 

FO 1013

 

 

a

b

30

20 min

Dimensions are given in mm.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the furniture unit, in order to avoid any contact with the bottom of the hob which can be heated when it is operated. The recommended solution is shown in diagram 3.

The panel fitted under the hob ("a") should be easily removable to allow easy access if technical assistance is needed. The space behind the kitchen unit ("b") can be used for connections.

Fitting the Hob into the worktop

Carry out the building in of the hob as follows:

• put the seals supplied with the hob, on the edges of the cut out, taking care that the seals

meet without overlapping;

place the hob in the cut out, taking care that it is centred;

fix the hob with the relevant fixing clamps and screws, as shown in the diagram. When the screws have been tightened, the excess seal can be removed.

The edge of the hob forms a double seal which

 

prevents the ingress of liquids.

FO 0199

Seal

15

Page 15
Image 15
Tricity Bendix TBG 640 manual Building In, Building over a kitchen unit with door, Fitting the Hob into the worktop, Seal