Tricity Bendix TBG 640 manual Fault Finding, Preliminary Electrical Systems Check

Models: TBG 640

1 22
Download 22 pages 5.88 Kb
Page 18
Image 18
Fault Finding

Fault Finding

Preliminary Electrical Systems Check

PLUG (with cover removed)

SOCKET

 

(face view)

Brown Blue Green Yellow

Blue

BrownGreen Yellow

START

Isolate appliance and carry out:

A:Earth Continuity check.

Earth Wire Green/Yellow

Neutral Wire

Blue

(

)

 

FUSE

E(Preliminary Electrical Systems Check)

NL

NO

YES

Carry out:

 

Carry out:

 

Electricity supply

 

D: Resistance to

 

 

should now be

 

 

 

C: Polarity check.

 

 

 

 

 

 

 

Earth check.

 

satisfactory.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Has inlet fuse blown?

NO

YES

Inlet wiring faulty. Rectify any fault.

Isolate appliance and carry out:

B:Insulation check. Rectify any fault including replacing fuses as necessary.

A. EARTH CONTINUITY CHECK -

Appliance must be electrically disconnected - meter set on Ω (Ohms) x 1 scale and adjust zero if necessary.

a)Test leads from any appliance earth point

to earth pin on plug. Resistance should be less than 0.1 Ω (Ohm), check all earth

wires for continuity and all contacts clean and tight.

B. INSULATION CHECK - Appliance electrically disconnected, all switches ON.

a)meter set on Ω (Ohms) x 1 scale.

Test leads from L to N in appliance terminal block. If meter reads «0» then there is a short circuit.

b)meter set on Ω (Ohm) x 100 scale.

Repeat test with leads from L to E. If meter reads less than (infinity) there is a fault.

NOTE - Should it be found that the fuse has failed but no fault is indicated - a detailed continuity check (i.e. by disconnecting and checking each component) is required to trace the faulty component.

It is possible that a fault could occur as a result of local burning/arcing but no fault could be found under test. However a detailed visual inspection should reveal evidence of burning around the fault.

18

Page 18
Image 18
Tricity Bendix TBG 640 manual Fault Finding, Preliminary Electrical Systems Check, A. Earth Continuity Check