Tripp Lite manual SRX2, SRX3 and SRX4, Rack Mount Fixed And Roll-OutShelves, Manual

Models: SRX2 SRX3 SRX4

1 3
Download 3 pages 26.82 Kb
Page 1
Image 1
SRX2, SRX3 and SRX4

SRX2, SRX3 and SRX4

Rack Mount Fixed And Roll-Out Shelves

CLIP NUT INSTALLATION

Clip Nuts provide mounting points for rack mount fixed and roll-out shelves.

Clip nuts have a front or screw side. Consider which way it should face for ease of access to the screw head during component installation. (figure 1)

To remove a clip nut from a mounting angle, insert a flat blade screwdriver or knife under the tab on the front and pry up, freeing the retaining ring from the mounting angle. (figure 2)

1.Select the location at which the shelf will be mounted in the enclosure assembly.

2.Snap one clip nut into the top hole of the selected location.

(note: When mounting a roll-out shelf, insert a 10-32 screw partially into each clip nut.)

If the weight load will exceed 75 lbs. on a roll-out shelf, use four clip nuts and screws in each of the brackets.

It will be necessary to select a four-hole grouping that matches the mounting holes in the brackets. The center two holes will measure 1/2" apart.

Two screws per bracket, one at the front and one at the rear, is sufficient if the weight load will be less than 75 lbs.

3.Measure from the bottom of the Mounting Angle to the top clip nut. Assemble clip nuts onto the three other rails at the measured height.

Manual Part #93-1937

 

01/18/02 rev. A

1

 

Rack Mount Fixed And Roll-Out Shelves

Clip nut

#10-32 x 5/8" Pan

Head Machine Screw

Front or screw side

Figure 1

Mounting angle

Clip nut

Figure 2

Page 1
Image 1
Tripp Lite manual SRX2, SRX3 and SRX4, Rack Mount Fixed And Roll-OutShelves, Manual, 01/18/02 rev. A