Turbo Air TCB-5R manual Installation Instructions, Installation clearance, Inspection For Damage

Models: TCB-5R

1 20
Download 20 pages 47.92 Kb
Page 5
Image 5
INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSPECTION FOR DAMAGE

Customer is responsible for checking for damage. First inspect crate as soon sa it arrives. Prior to signing if crate is damaged make sure you note that on bill of lading.

If after uncrating there is concealed damaged and crate was in good condition you must call Customer Service at Turbo Air. Concealed damage must be reported within 24 hours of receiving unit. Bill of lading will be requested faxed to claim department. Pictures may be requested of unit and crating.

LOCATION OF BAKERY CASE

Installation clearance:

86 inch at the top, 20 inch at the rear and 12 inch at the each side.

!CAUTION; Damage to case and glass can result if pushed on. Do not push curved glass, end glass, doors or door frames.

Do not place Bakery Case in the following locations; near source of heat, excessive air movement, open doors, and direct sunlight.

Move the bakery case to the final location before removing shipping skid.

Condenser is in back of Bakery Case. Do not block inlet.

LEVELING OF BAKERY CASE

Four leveling legs are provided for leveling Bakery Case.

Use a leveler to make sure unit is leveled on all four corners.

If unit is not leveled drainage of water will not drain properly and doors will not close properly. Leveling legs can be adjusted accordingly.

Page 5
Image 5
Turbo Air TCB-5R manual Installation Instructions, Installation clearance, Inspection For Damage, Location Of Bakery Case