
INTRODUCTION
Design ■ Features ■ Performance
SEQUENCE OF OPERATION
On initial
1.The water solenoid valve and hot gas solenoid valve are opened (energized) for 180 seconds
(three minutes). This ensures the icemaking cycle starts with fresh water, and the refrigerant pressures are equalized prior to compressor
2.The compressor starts 175 seconds after the hot gas solenoid valve and water solenoid valves are opened.
3.The water pump and condenser fan motor are energized. The hot gas solenoid valve and water solenoid valves are
4.As the water pump circulates the water, an even flow is directed across the evaporator and into each cube cell, where it freezes. As the water freezes, gravity causes any sediment to drop into the water trough and not becoming imbedded in the ice. This gives a clearer cube with low mineral content.
5.The control system automatically determines the length of the freeze cycle by monitoring the temp- erature of the refrigeration system “high side” using a thermistor.
6.One minute prior to finishing the determined freeze cycle, the control determines the length of the harvest cycle by again monitoring the temperature at the thermistor.
7.When the freeze cycle is completed, the control
8.At the conclusion of the harvest cycle, the machine returns to a new freeze cycle. The compressor continues to run. The water pump and condenser fan motor are energized. The hot gas solenoid valve and water solenoid valves are
Automatic
The ice machine
94