U-Line U-2224ZWCS-15A, U-2218WCS-00A Installation, Leveling Information, Plug in the power cord

Models: U-2224ZWCS-13A U-2224ZWCS-01A U-2224ZWCS-00A U-2224ZWCS-15A U-2224ZWCINT-61A U-2224ZWCINT-01A U-2218WCINT-00A U-2218WCINT-01A U-2218WCS-01A U-2218WCS-00A U-2224ZWCINT-00A U-2224ZWCINT-60A

1 12
Download 12 pages 40.17 Kb
Page 8
Image 8
General Installation

QUICK START GUIDE

u-line.com

General Installation

INSTALLATION

LEVELING INFORMATION

1. Plug in the power cord.

 

1. Use a level to confirm the unit is level. Level should be placed along

2. Gently push the unit into position. Be careful to not

entangle the power cord.

top edge and side edge as shown.

1

INSTALLATION2

3.

Re-check the leveling, from front to back and side to

 

side. Make any necessary adjustments. The unit’s top

 

surface should be approximately 1/8" (3 mm) below

 

the countertop.

4.

Install the anti-tip bracket.

2.If the unit is not level, remove grille and adjust feet as necessary.

3.Confirm the unit is level after each adjustment and repeat the previous steps until the unit is level.

5. Remove the tape from the glass shelves and wipe out

the inside of the unit with a clean, water-dampened

cloth.

LEVELING INFORMATION Rotate Forward Feet to Adjust 1. Plug in the power cord.

INSTALLATION TIP

If the room floor is higher than the floor in the cut-out opening, adjust the rear feet to achieve a total unit rear height of 1/8" (3 mm) less than the opening’s rear height. Shorten the unit height in the front by adjusting the front feet. This allows the unit to be gently tipped into the opening. Adjust the front feet to level the unit after it is correctly positioned in the opening.

5

Page 8
Image 8
U-Line U-2224ZWCS-15A, U-2218WCS-00A Leveling Information, Plug in the power cord, Installation Tip, Quick Start Guide