United States Stove 1600, 1800 manual Brick Installation Pre-Installedat Factory

Models: 1600 1800

1 32
Download 32 pages 59.51 Kb
Page 9
Image 9
BRICK INSTALLATION

BRICK INSTALLATION

(PRE-INSTALLED AT FACTORY)

NOTE: Prior to operation, be sure to remove brick retaining strips.

FIREBOX:

1

2

3

The firebrick must be inserted on each side resting on the

SMOKE DOOR CLIPS

1/4" LOCK NUTS

1/4" X 1-1/4"

CARRIAGE BOLTS

FRONT

OF

FURNACE

SMOKE DOOR

FUEL

LOADING

DOOR

FRAME

grate frame. First, place cut brick in each back corner. Place remaining brick in place.

SMOKE CHAMBER:

1.Place #1 firebrick in the back of smoke chamber.

2.Slide baffle plate into smoke chamber, flat side down.

3.Place remaining firebrick in smoke chamber as

SPIN DRAFT CAP

1/2" X 2-1/2"

CARRIAGE

BOLT

1/2" LOCK NUT

7

Page 9
Image 9
United States Stove 1600, 1800 manual Brick Installation Pre-Installedat Factory