Contents
227 Industrial Park Road P.O. Box
which may differ from this manual
UNITED STATES STOVE COMPANY
South Pittsburg, TN
FURNACE ASSEMBLY
CHIMNEY INSTALLATION
FURNACE INSTALLATION
CAUTION OVERFIRING YOUR FURNACE VOIDS WARRANTY
Table Of Contents
Welcome
Furnace
General Rules
Inspect and clean flues and chimney regularly
WARNING - Risk of Fire
How Your New Furnace Works
Parts
FOR MODELS 24AF
PART #
Parts
24AF
DESCRIPTION
FOR MODELS 24AG, 24AZ
Parts
N/S = NOT SHOWN ** = USED ON 24AZ
Parts
FOR MODELS 24AG, 24AZ
PART #
INSTALLATION#1
Installation
Furnace location
INSTALLATION#2
Clearance to Combustibles
NOTE INSTALLONLYONANON-COMBUSTIBLEFLOOR
Clearance to Combustible Materials
FLUE RECOMMENDATIONS
WHAT SIZE CHIMNEY SHOULD BE USED?
MASONRY CHIMNEYS
INSTALLING A NEW CHIMNEY
CONNECTING STOVE PIPE TO A METAL CHIMNEY
CHIMNEY DRAFT REGULATORS
REAR OF FURNACE DISTRIBUTION FAN
DRAFT FAN DISTRIBUTION FAN
5a. Attaching furnace control center box. To separate outer cover, remove two 2 side screws and pull off black rheostat knob. Attach box to left side facing feed door with four 4 self-threadingscrews. One screw in each corner. NOTE Furnace control center is designed for left side attachment. Should space prohibit such, reversing shrouds for right side installation is possible, however, control wires from box will have to be ex- tended
Page
13.Installing front and rear cast baffles, heat plates. NOTE Grate frames and brick will slide forward and backward to allow baffle to fit. Install front cast baffle using two 2 5/16 bolts, nuts & washers 7/16 wrench will be needed. Place the side of the baffle that has the two ribs against the front weld of the firebox. Do not tighten bolts yet. Place the rear cast baffle to the back of the firebox but do not attach the bolts at this time
17.Reposition door latches, feed and ash door
24CRM
Accessories Filter Box
Domestic Hot Water Coil
11WCK
THERMAL DISC
WIRING DIAGRAM
FAN ADJUSTMENT
DISTRIBUTION FAN
OPERATION OF YOUR NEW WOOD BURNING FURNACE
Control Box & Electrical Component
10 BASIC FUNCTIONS OF ELECTRICAL SYSTEM
NOWPROCEEDWITHLIGHTINGAFIRE
ASH REMOVAL
CREOSOTE FORMATION AND NEED FOR REMOVAL
MAINTENANCE
BURNING COAL
SHAKING
SAFETY
ASHES
CLINKERS
Solution
Trouble-Shooting
TROUBLE-SHOOTING,PROBLEM SOLVING FOR YOUR FURNACE
Solution
USSC
Page
HOW TO ORDER REPAIR PARTS
4.THE SERIAL NUMBER