Vermont Casting VCBV10, VCPV30, VCPV18, VCPV10, VCPV06 Connect to Gas Supply, Floor Installation

Models: VCBV10 VCBV30 VCPV18 VCPV30 VCPV10 VCPV06 VCBV20

1 16
Download 16 pages 53.61 Kb
Page 6
Image 6
Connect to Gas Supply

Vermont Castings VCBVMN/MP & VCPVMN/MP Room Heaters

1/16"

(1.6mm)

RH102

Connect to Gas Supply

Before connecting the appliance, turn off all gas appli- ances. Close the main gas valve at the gas meter or Lp tank. Make certain there is good ventilation where the installation will be made. Installation should comply with all applicable building codes and ANSI Z223.1, latest edition. Use LP gas resistant pipe compound to seal threaded joints.

An installer supplied, design certified gas pressure regulator must be installed to bring the gas supply pressure down to 14” w.c.

WARNING: Never connect an unregulated gas line to the heater.

IMPORTANT: Check gas line pressure before connect- ing heater to gas line. Gas line pressure must not be higher than 14” w.c. If gas line pressure is higher, heater gas pressure regulator damage could occur.

NOTE: The gas line connection can be made with 3/8” black or steel pipe. Internally tinned copper tubing may be used in certain areas. Check your local codes. Use pipe of large enough diameter to allow proper gas volume to heater. If pipe is too small, undue pressure loss will occur.

Fig. 4 Wall anchor.

Floor Installation

1. Heater may only be installed on a noncombustible

flat surface. Wall mounting screws may be used to

keep heater from side movements.

CAUTION: Use pipe joint sealant that is resistant to liquefied petroleum gases.

Install sediment trap in supply line as shown in Figure 6. Locate sediment trap where it is within reach for

2.

Measure heater mounting screw location “X” as

 

desired above floor. (Fig. 5)

3.

Use enclosed “paper template” for proper distance

 

between holes. Be sure template is level. It may be

 

necessary to use plastic or lead anchors for plaster

 

wall.

4.

Drill holes at marked locations using 9/64” drill bit.

5.

Leave screw head out from wall far enough to attach

 

heater.

Screw Holes

X

Floor

RH107

Fig. 5 Optional wall mounting screws for floor installation.

Pressure

Regulator

3/8” NPT Nipple

 

 

 

 

 

 

 

 

GaugeTest

Connection

 

 

Tee Joint

 

Reducer

 

 

 

 

 

Bushing to

 

 

 

 

 

1/8” NPT

 

 

 

 

 

 

 

 

 

 

1/8” NPT

 

 

 

 

 

Plug Tab

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sediment Trap

 

 

 

 

Tee Joint

 

 

 

 

 

 

Cap

RH103

 

 

 

Pipe Nipple

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 6 Gas line connection.

Heater

Cabinet

Ground Joint

Union

Manual

Shutt-Off

Valve

Floor Installation From Gas

Meter

Natural Gas (4” w.c. to

10.5” w.c. Pressure) LP Gases

(11.5” w.c. to

14.0” w.c. Pressure)

6

Page 6
Image 6
Vermont Casting VCBV10, VCPV30, VCPV18, VCPV10, VCPV06, VCBV30, VCBV20 Connect to Gas Supply, Floor Installation