PRESSURE REGULATOR INSTALLATION
STEP 1 |
|
|
|
| |
Mount the 3/8” NPT (conical) male connector to the pressure |
|
|
|
| |
regulator and tighten by using a wrench. |
|
|
|
|
|
Do not over tighten the connector. | LOCK | ||||
Over tightening may crack regulator. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Arrow
Fig. 6.2a
STEP 2
Assemble the 3/8” NPT connector + pressure regulator group to the manifold interposing the gasket supplied. The regulator cover must be oriented toward the back of the cabinet.
IMPORTANT: use two spanners to tighten the connection.
Regulator cover
Fig. 6.2b
20