Verona VEBIG24 warranty Pressure Regulator Installation, Step, Arrow, Lock, 2a, 2b

Models: VEBIG24

1 28
Download 28 pages 45.85 Kb
Page 20
Image 20
PRESSURE REGULATOR INSTALLATION

￿

PRESSURE REGULATOR INSTALLATION

STEP 1

 

 

 

 

￿

Mount the 3/8” NPT (conical) male connector to the pressure

 

 

 

 

regulator and tighten by using a wrench.

 

 

 

 

 

Do not over tighten the connector.

LOCK

Over tightening may crack regulator.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Arrow

Fig. 6.2a

STEP 2

Assemble the 3/8” NPT connector + pressure regulator group to the manifold interposing the gasket supplied. The regulator cover must be oriented toward the back of the cabinet.

IMPORTANT: use two spanners to tighten the connection.

Regulator cover

Fig. 6.2b

20

Page 20
Image 20
Verona VEBIG24 warranty Pressure Regulator Installation, Step, Arrow, Lock, 2a, 2b