INSTALLATION
2 - 1

2.0 INSTALLATION AND INITIAL SET-UP

WARNING
Always disconnect power before opening covers, doors,
enclosures, gates, panels, or shields. Never make internal
adjustments or perform maintenance or service when alone
or fatigued. Main power connections and grounding should
be performed by qualified personnel. Keep away from live
circuits; know your equipment and don't take chances. In
case of emergency, be sure to disconnect power before
touching equipment or personnel in contact with the
equipment.

2.1 Overview

This section of the manual provides the information necessary for the installation and
initial set-up of the 7122B/7133B ACU.
The system installation and set-up instructions are presented in the following general
order.
· Mechanical Installation
· System Cabling
· Power-Up and Set-Up

2.2 Mechanical Installation

2.2.1 Antenna Mounted Components

Proper and complete installation of the 7122B/7133B outside unit, motors, resolvers,
and limit switches is imperative for safe and accurate system operation. Refer to the
mechanical drawings supplied in the drawing package separate from this manual for
mechanical interface details and complete this phase of installation first.

2.2.2 Installing the 7122B/7133B ACU

Using four No. 10 screws, mount the 7122B/7133B ACU inside a standard 19-inch
EIA rack. No added support is necessary.

2.3 System Cabling

Refer to Figure 2-1 for a block diagram of the 7122B/7133B Antenna Control
System. The following paragraphs describe the cabling and list the connections for
the 7122B/7133B. Cables must be connected from the antenna to the OU, from the
OU to the 7122B/7133B ACU, and from the antenna resolvers to the ACU. Be sure
the cables are connected correctly and securely because proper functioning of the
system during power-up is important for the protection of the equipment and for
timely completion of the installation.