ViewSonic Installation And Operation, PS500B/PS800B, Unpacking and Inspection, 3.2Placement

Models: PS500B PS800B

1 25
Download 25 pages 49.89 Kb
Page 16
Image 16
3. INSTALLATION AND OPERATION

8

PS500B/PS800B

3. INSTALLATION AND OPERATION

Before installation, please read and understand the following instructions:

3.1 Unpacking and Inspection

Examine the packing carton for damage. Notify the carrier immediately if damage is observed.

3.2Placement

1.This unit is intended for indoor use only. Although your UPS is very rugged, its internal components are not sealed from the environment.

2.The UPS must be installed in a protected environment away from heat- emitting appliances such as a radiator or heater. Do not install this product where excessive moisture is present.

3.The location should provide adequate air flow around the UPS with one inch minimum clearance on all sides for proper ventilation.

Page 16
Image 16
ViewSonic manual Installation And Operation, PS500B/PS800B, Unpacking and Inspection, 3.2Placement