ViewSonic manual PS500B/PS800B, 3.6Operation and Functional Test, 3.7Storage Instructions

Models: PS500B PS800B

1 25
Download 25 pages 49.89 Kb
Page 19
Image 19
3.6Operation and Functional Test

PS500B/PS800B

11

 

 

 

3.6Operation and Functional Test

1.Plug in the AC input cord to the rear panel and turn on the UPS by pressing the “On/Off” switch for 2 seconds. The UPS will beep and the front panel Normal Mode LED will light.

2.The UPS may be overloaded if the buzzer sounds continuously and the Overload LED lights. Unplug the least critical devices, such as a printer, etc… If the buzzer is still sounding, the battery or UPS may be faulty. Contact your local dealer for assistance.

Note: Backup all unsaved files before you perform the following functional test.

3.To test the backup function, you may unplug the power cord of the UPS or simply press the On Button on the front panel. During this test, observe that your equipment operates properly and without interruption. If you leave your UPS on continuously, it is a good idea to perform a “Test” at least once a month.

If you unplug the power cord, all models will beep once every 4 seconds. You can press the Test Button to silence the alarm. The Battery Mode LED will light. Plug the power cord back in after a few seconds.

If you press the On Button, the Battery Mode graph will light momentarily.

3.7Storage Instructions

For extended storage in moderate climates, the battery should be charged for 12 hours every 3 months. Repeat it every 2 months in high temperature locations. Plug in the power cord.

Page 19
Image 19
ViewSonic manual PS500B/PS800B, 3.6Operation and Functional Test, 3.7Storage Instructions