A s s e m b l y

 

S T E P 3

 

 

G u i d e

 

 

E1400 AND E1500

 

 

UPRIGHT FITNESS BIKES

Rear Foot

S T E P 2

To avoid possible damage to this Fitness Bike, please follow these assembly steps in the correct order.

S T E P 1

 

Before proceeding, find your new Fitness Bike’s serial number located on the front axle tube, and enter

 

here:

 

 

Refer to this number when calling for service, and enter this serial number on your Warranty Card and in

Front Support

 

Tube

 

your own records. Be sure to read your Owner’s Guide before using your new Fitness Bike.

 

 

 

If any parts, hardware or tools are missing, please call 1.800.335.4348, Extension 12

 

 

NOTE: It is recommended that you apply grease to the threads of each bolt and screw as you assemble your Fitness Bike to prevent loosening and noise. Also, during each assembly step, ensure that ALL bolts and screws are in place and partially threaded in before completely tightening any ONE bolt or screw.

PINK BAG

• Slide the console mast cover onto the

console mast.

• Wrap the wire tie that exits the

bottom of the console mast around the

end of the console cable that is resting

in the console mast mounting bracket.

Pull the wire tie with the wire harness up

through the console mast. Slide the

console mast over the console mast

mounting bracket. Insert three bolts

(M8x15L) with three lock washers

(SW8) to each side of the mast. Insert a

set screw (M8x10L) to the front side of

the mast and tighten with the 4mm

L-Shaped wrench. Tighten all other bolts

with the 5mm T-Shaped wrench. Slide

the console mast cover down so that it

sits in place on the bike.

• Slide the heart rate wires from the

handlebar through the hole in the

handlebar mounting bracket on the

console mast. Pull the wires completely

through the hole and set the handlebars

into place on the bracket. Secure the

handlebars in place with the two bolts

(M8x20L) and two lock washers

(SW8). Tighten with the 5mm T-Shaped

wrench.

S T E P 1 ORANGE BAG

Position the front support tube in place under the mounting plate on the front side of the bike. Insert two bolts (M8x20L) with lock washers (SW8) and arc washers (M8x18x1.5T) into the holes. Tighten with the 5mm L-shaped wrench.

S T E P 2

BLUE BAG

 

 

 

• Slide the rear foot into place on the

 

Seat Post

 

frame. Insert two bolts (M8x20L) with

 

 

two lock washers (SW8) to the outside

 

Stud

 

holes. Insert two bolts (M8x70L) with

 

 

 

two lock washers (SW8) to the inside

 

 

 

holes. Tighten all bolts with the 5mm

 

 

 

T-Shaped wrench.

Seat Post

S T E P 4

 

 

 

 

 

Adjustment Knob

Console

S T E P 4

Wire Harness

Heart Rate

Wires

Console Mast

S T E P 3

Console Mast

Cover

• Remove the four bolts from the back

side of the console. Plug the console

cable and heart rate wires into the back

side of the console. Place the console

onto the mounting plate of the console

mast and re-insert the four mounting

bolt. Tighten with the screwdriver.

• Remove the two bolts from the

backside of the console mast. Attach

the water bottle cage to the mast with

these two bolts. Tighten with the

screwdriver. Insert water bottle.

SEAT & PEDALS

Slide the seat onto the seat post stud. Tighten the 14mm nuts on the bottom side of the seat to secure in place.

Slide the seat post into the frame seat post bracket.

Insert the adjustment knob through the seat post bracket and turn to tighten.

Attach left and right pedal straps to left and right pedals.

Attach left and right pedals to left and right crank arms. NOTE: both pedals and crank arms should be labeled left or right. Tighten with the included pedal wrench.

Plug in power supply to power socket on the front side of the bike.

Page 3
Image 3
Vision Fitness E1400 manual Pink BAG, E P 1 Orange BAG, Seat & Pedals