TOP SUPPORT BRACKET
TOP
SUPPORT
BRACKETS
RAIL
|
|
| |
|
|
|
|
|
|
| |
Fig. 5 |
| Fig. 6 |
5.Line up holes on top brackets. Attach
6.Reassemble bottom cover on cheesemelter (8 screws).
7.Attach shelf to back riser if included.
GAS CONNECTIONS
CAUTION: All gas supply connections and any pipe joint compound used must be resistant to the action of propane gases.
Codes require that a gas shutoff valve be installed in the gas line ahead of the cheesemelter.
Install the pressure regulator to the top gas connection. The arrow on the regulator indicates the direction of the gas flow (Fig. 7).
The regulator must be installed within the tower in an upright position. If it is mounted in any other position, the pressure must be reset (Fig. 8).
GAS CONNECTION
| GAS PRESSURE |
|
| GAS PRESSURE REGULATOR | |
| REGULATOR |
|
| IN UPRIGHT POSITION | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| |
Fig. 7 |
| Fig. 8 |
— 7 —