Vulcan-Hart VGL60E, VGL20 Electrical Connection, Cord Connected Steam Kettles, Performance Check

Models: VGL20E VGL60 VGL40E VGL40 VGL20 VGL60E

1 12
Download 12 pages 62.52 Kb
Page 6
Image 6
ELECTRICAL CONNECTION

ELECTRICAL CONNECTION

Refer to the electrical diagram attached to the inside of the front panel and to ELECTRICAL DATA.

ELECTRICAL DATA

MODEL

Volts / Hz / Ph

Standard / Optional

Amps

Circuit Requirement

 

 

 

 

 

 

115 / 60 / 1

Standard

2.0

15 Amp Cord/Plug

VGL Series

 

 

 

 

208 / 60 / 1 or 3

Optional

1.0

Hard wire

 

 

 

 

 

 

236 / 60 / 1 or 3

Optional

1.0

Hard wire

 

 

 

 

 

Cord Connected Steam Kettles

WARNING: THE SUPPLY CORD ON THE STEAM KETTLE IS PROVIDED WITH A GROUNDING PLUG. THE OUTLET TO WHICH THIS PLUG IS CONNECTED MUST BE PROPERLY GROUNDED. IF THE RECEPTACLE IS NOT THE PROPER GROUNDING TYPE, CONTACT AN ELECTRICIAN.

Hard Wire Connected Steam Kettles

WARNING: ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE APPLICABLE PORTIONS OF THE NATIONAL ELECTRICAL CODE AND/OR OTHER LOCAL CODES.

WARNING: DISCONNECT THE ELECTRICAL POWER SUPPLY AND PLACE A TAG AT THE DISCONNECT SWITCH INDICATING THAT YOUR ARE WORKING ON THE CIRCUIT.

Units equipped for 208 or 236 volt / 60 Hz, single- or three-phase electrical service, are factory equipped with a transformer. To connect supply wires, remove the cover from the transformer box at the right rear of the unit. Route supply wires and ground wire through the hole in the cover with a strain relief fitting. Connect wires to the primary transformer terminals as required by your power supply voltage. Connect ground wire to the ground lug. Replace cover. Three-phase units are wired as above, using only two supply wires. The third supply wire is not connected and must be properly terminated.

PERFORMANCE CHECK

The following items should be checked at installation by a qualified service technician.

1.Verify correct gas type.

2.Verify correct voltage, cycle and phase.

3.Gas pressure.

4.Internal gas connections.

5.Internal electrical connections.

6.Pilots — adjustment and ignition.

7.Burners — adjustment and ignition.

8.Thermostat — cycle for operation check.

9.Gas supply valve — check for operation.

10.Check hinge and lid assembly.

11.Draw-off valve — check operation.

12.Advise user on cleaning procedures.

– 6 –

Page 6
Image 6
Vulcan-Hart VGL60E, VGL20, VGL40 Electrical Connection, Cord Connected Steam Kettles, Hard Wire Connected Steam Kettles