VXL Instruments Ltd. Itona TC4xyy Hardware User’s Guide
Installation
This chapter describes hardware installation of the product.

Step One: Unpack

Unpack the unit taking care not to drop the product whilst removing from the packaging.
The carton in which the product was shipped to you contains the following:
Itona TC4xyy Series Thin Client
Pedestal Set
Power Cord ( Optional )
Mouse (Optional )
Hardware Installation Guide
When you open the carton, if you find any discrepancy between the contents of the carton and the
above list, contact the dealer or reseller from whom you have purchased the product, immediately.
9
NOTE: PLEASE RETAIN THE ORIGINAL CARTON AND PACKING MATERIAL. THEY WOULD BE REQUIRED TO
AVOID DAMAGE DURING TRANSIT (IF REQUIRED IN FUTURE).

Step Two: Prepare

1. The site where you want to install the product must have the following
2.
100~240V AC, 1.2A, 50/60 Hz, 3-pin power Inlet for client (Itona TC4xyy).
NOTE: ENSURE THAT THE POWER INLET PLUG IS PROPERLY REGULATED AND EARTHED. A FLOATING
GROUND / CHASSIS COULD CAUSE AN ELECTRIC SHOCK.
9
Fix the pedestals at the bottom of the Itona TC4xyy.
Well ventilated, clean, dry and dust free atmosphere
Specified environmental conditions (refer to the section on specifications )
Table or desk of suitable size.
3. Place the product on the table in a location that provides quick and easy access to the power Inlet
plug to shutdown the power in emergencies.
4. Ensure a minimum space of 2 inches (5 cm) on all sides of the unit for efficient convection cooling.
Installation 8