MAINTENANCE
Lubrication
| DESCRIPTION | INTERVAL | LUBRICATION REQUIRED | ||
Driveline | 8 hours | Grease each universal joint | |||
24 hours | Separate the sliding parts and cover each | ||||
|
| part with grease | |||
|
|
| |||
Driving chain | 2 hours and after | Lubricate with chain saw lubricant | |||
each operation | |||||
|
|
|
| ||
Gearbox | every month | Check grease level. If needed, add Unirex | |||
Ep2 Grease | |||||
|
|
| |||
Lift Handle Mounting | 8 hours | Grease fitting | |||
Tubes | |||||
|
|
| |||
Rotation Worm | 4 hours | Lubricate with chain saw lubricant | |||
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|
OM | 21 |