Install Flavorizer® Bars and Cooking Grates You will need: five Flavorizer Bars and two cooking grates.

Place the Flavorizer Bars side by side in the cooking box.

Set the cooking grates onto the ledges in the cooking box with the rounded sides up.

Installing the Warm-Up™ Basket

You will need: Warm-Up Basket

Insert one end of the Weber Warm-Up Basket into the hole at the right side of the inside of the lid, and the other end into the slot at the left side of the lid.

Installing the warming rack

You will need: warming rack.

Set the warming rack into the slots at the rear of the cooking box.

Install the bottom shelf

You will need: Bottom shelf.

Set the bottom shelf in place between the two frame connectors underneath the cooking box.

Install the condiment basket

Place the wire hooks over the front frame to the left of the cooking box and to the right of the control panel.

B-2

Page 12
Image 12
Weber Genesis Gold C manual Installing the Warm-Up Basket, Installing the warming rack, Install the bottom shelf