Weider WESY2916.1 user manual

Models: WESY2916.1

1 36
Download 36 pages 61.21 Kb
Page 20
Image 20

34.Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley to the Base (1) with an M10 x 45mm Bolt (86), two Half Guards (55), and an M10 Nylon Locknut (77).

35.Wrap the Leg Lever Cable (51) over a 90mm Pulley (48). Attach the Pulley to the Double “U”- bracket (61) with an M10 x 45mm Bolt (86), two Half Guards (55), and an M10 Nylon Locknut (77).

36.Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley to the Upright (2) with an M10 x 120mm Bolt (115), two Half Guards (55), an M10 Washer (80), and a Cable Trap (56).

34

 

 

51

 

 

48

 

 

86

 

 

55

 

 

1 55

77

35

 

 

77

 

 

61

 

 

55

 

 

48

 

 

51

 

 

 

 

86

 

 

55

36

 

 

115

2

 

80 48

 

51

 

56

 

 

55

 

 

55

 

 

20

Page 20
Image 20
Weider WESY2916.1 user manual