20.Remove the preattached 3 1/2” Pulleys (78 [only one is shown]) from the Offset Double “U”- bracket (61).
Wrap the VKR High Cable (74) under a 3 1/2” Pulley (78). Attach the Pulley to the Offset Double
21.Wrap the VKR High Cable (74) over a 4 1/2” Pulley
(119).Attach the Pulley inside of the indicated
bracket on the Top Frame (6) with 3/8” x 1 3/4” Bolt
(93)and a 3/8” Nylon Locknut (87).
22.Lift the Weight Tube (43) and the Top Weight (45) closest to the VKR Upright (5). Make sure that the small pin on the Weight Tube is inside of the groove under the Top Weight.
Place a 1/2” Washer (1) on top of the Weight Tube (43). Tighten a 1/2” Nut (118) halfway onto the end of the VKR High Cable (74). Screw the end of the Cable two full turns into the Weight Tube. Then, tight- en the Nut against the 1/2” Washer.
23.Locate the Lat Cable (88), which is 89 1/4” long and has an eyelet on one end and a ball on the other end. Route the eyelet end of the Cable up through the Butterfly Top Frame (7) and around a 3 1/2” Pulley (78). Attach the Pulley inside of the Butterfly Top Frame with a 3/8” x 2 3/4” Bolt (101), two 3/8” Washers (91), two 1/2” Spacers (89), and a 3/8” Nylon Locknut (87).
12
20 |
|
| 74 |
78 | 93 |
| 87 |
| 61 |
21 | 6 |
| |
| 87 |
93 |
|
| 119 |
| 74 |
22 |
|
5 |
|
| 74 |
| 118 |
43 | 1 |
| |
45 |
|
23 |
|
| 7 |
78 |
|
87 |
|
91 |
|
89 | 91 |
| 101 |
88 |
|