16.Lubricate a 3/8” x 3” Button Head Bolt (104) and both sides of two Plastic Washers (56) with grease. Attach the Right Butterfly Arm (26) to the Butterfly Frame (47) with the Bolt, the two Plastic Washers, two Butterfly Caps (57), two 3/8” Washers (91), and a 3/8” Nylon Jamnut (113) as shown.Make sure that the recessed sides of the Plastic Washers are fitted over the welded bushing in the Butterfly Arm. Do not overtighten the Nylon Jamnut; the Butterfly Arm must be able to pivot easily.

Repeat this step with the Left Butterfly Arm (25).

17.Wet the Left VKR Arm (30) with soapy water. Slide a Short Pad (20) onto the VKR Arm. Attach a VKR Handle (66) to the VKR Arm with a 3/8” Washer (91) and a 3/8” Nylon Jamnut (113). Slide an Inner Cap w/Hole (111) onto the end of the VKR Arm.

Wet the VKR Handle (66) and the handle welded to the Left VKR Arm (30) with soapy water. Slide 5” Handgrips (36) onto both handles.

Repeat this step with the Right VKR Arm (31).

18.Attach the Left and Right VKR Arms (30, 31) to the VKR Upright (5) with two 3/8” x 2 3/4” Bolts (101) and two 3/8” Nylon Jamnuts (113).

16

104

26

91

 

57

56

47

 

 

57

 

25

 

91

 

113

17

 

36

31

111

36

 

66

20

 

 

91

 

113

 

30

18

 

 

31

 

113

 

101

19.

CABLE ASSEMBLY

IMPORTANT: Refer to the Cable Identification Chart on page 26 for help identifying the cables. Do not overtighten the bolts and nuts attaching the pulleys. The pulleys must be able to turn freely.

30

 

5

19

90

59

 

 

 

 

6

 

86

 

Locate and open the parts bags labeled “CABLE ASSEMBLY” and “PULLEYS.”

Locate the VKR High Cable (74), which is 82 1/4” long and has an eyelet on one end and a thread- ed bolt on the other end. Attach the eyelet end of the Cable inside of the Top Frame (6) with a 5/16” x 2 1/2” Bolt (59), two 5/16” Washers (90), and a 5/16” Nylon Locknut (86).

11

74

Page 11
Image 11
Weider WESY38321 user manual Repeat this step with the Left Butterfly Arm, Repeat this step with the Right VKR Arm