19. Wrap the Long Cable (80) under a 90mm Pulley | 19 |
|
|
|
|
|
|
|
| |
(28) as shown. Attach the Pulley and a Pulley |
|
|
|
|
|
|
|
| ||
Guard (29) to the Upright (3) with a 3/8” x 4 1/2” |
|
|
|
|
|
|
|
|
| |
Button Bolt (40) and a 3/8” Nylon Locknut (76). |
|
| 3 |
|
|
|
|
|
| |
Make sure the flat edge of the Pulley Guard is |
|
|
|
|
|
| 28 |
| ||
on the bottom. |
|
| 40 |
|
|
|
|
| 76 | |
|
|
|
|
|
|
|
| 29 | ||
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| Flat | 80 | |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| Edge |
| |
20. Attach a Pulley Housing (94) to the indicated “U”- | 20 |
|
|
|
|
|
|
|
| |
channel on the |
|
|
|
|
|
|
|
| ||
(44) with a 3/8” x 4” Button Bolt (24), two Pivot |
|
| 44 |
|
|
|
|
|
| |
Bushings (74), and a 3/8” Nylon Locknut (76). |
|
|
|
|
| 74 |
|
| ||
Wrap the Long Cable (80) around a 90mm Pulley |
|
| 74 |
|
|
| 76 | |||
(28). Attach the Pulley inside of the Pulley |
|
| 94 |
|
|
|
| |||
Housing (94) with a 3/8” x 1 1/2” Button Bolt (71) |
| 24 |
|
|
| 76 |
|
| ||
and a 3/8 Nylon Locknut (76). |
| 71 |
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| 28 |
|
| |
21. Wrap the Long Cable (80) around a 90mm Pulley |
|
|
|
|
| 80 |
|
| ||
21 |
|
|
|
|
|
|
|
| ||
(28). Attach the Pulley and a Pulley Guard (29) to | 28 |
|
|
|
|
|
| |||
the indicated 3/8” x 5 1/2” Carriage Bolt (73) with |
|
|
| 29 |
|
|
| |||
a 3/8” Nylon Locknut (76). Make sure the flat |
|
|
|
|
|
|
|
| ||
edge of the Pulley Guard is on the side |
| 80 |
|
|
|
| 76 |
|
| |
shown. |
|
| Flat |
|
|
|
| |||
|
|
|
|
|
|
|
|
| ||
22. Make sure there are no Resistance Bars (not |
|
| Edge | 73 |
|
|
| |||
shown) under the |
|
|
|
|
|
|
| |||
Center Resistance Bar (not shown). Have a sec- |
|
|
|
|
|
|
|
|
| |
ond person pull on the Long Cable (80) to create | 22 |
|
|
|
|
|
|
|
| |
slack in the Cable. |
|
|
|
|
|
|
|
|
| |
Insert the end of the Long Cable (80) through the |
|
|
|
|
|
|
|
|
| |
welded tube on the indicated end of the Cross |
|
|
|
|
| 71 |
|
|
| |
Tube (11) and then through the remaining Swivel |
|
| Rod | 22 | 107 |
|
| |||
Arm (22). Make sure the Cable is on the indicat- |
|
|
|
|
| |||||
ed side of the welded rod in the Swivel Arm. |
| 80 |
|
|
|
|
|
|
| |
Insert the Swivel Arm (22) into the welded tube |
| 28 |
|
| 11 |
|
| |||
|
|
|
|
|
| |||||
on the Cross Tube (11). Secure the Swivel Arm |
|
| 76 |
|
|
| ||||
with a #8 x 3/8” Screw (107). |
|
|
|
|
|
|
|
| ||
Wrap the Long Cable (80) around a 90mm Pulley |
|
|
|
|
|
|
|
|
| |
(28). Attach the Pulley inside of the Swivel Arm |
|
|
|
|
|
|
|
|
| |
(22) with a 3/8” x 1 1/2” | Button Bolt (71) and a |
|
|
|
|
|
|
|
|
|
3/8” Nylon Locknut (76). |
| 11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|