
20.Wrap the Long Cable (80) under a 90mm Pulley (28) as shown. Attach the Pulley and a Pulley Guard (29) to the Upright (3) with an M10 x 113mm Button Head Bolt (40) and an M10 Nylon Locknut (76). Make sure that the flat edge of the Pulley Guard is on the bottom.
21.Attach a Pulley Housing (94) to the indicated “U”- channel on the
Wrap the Long Cable (80) around a 90mm Pulley (28). Attach the Pulley inside of the Pulley Housing (94) with an M10 x 42mm Button Head Bolt (71) and an M10 Nylon Locknut (76).
22.Wrap the Long Cable (80) around a 90mm Pulley
(28).Attach the Pulley and a Pulley Guard (29) to the indicated M10 x 140mm Carriage Bolt (73) with an M10 Nylon Locknut (76). Make sure that the flat edge of the Pulley Guard is on the side shown.
23.Make sure there are no Resistance Bars (not shown) under the
Insert the end of the Long Cable (80) through the welded tube on the indicated end of the Cross Tube (11) and then through the remaining Swivel Arm (22). Make sure the Cable is on the indi- cated side of the welded rod in the Swivel Arm.
Insert the Swivel Arm (22) into the welded tube on the Cross Tube (11). Secure the Swivel Arm with an M4 x 5mm Screw (104).
Wrap the Long Cable (80) around a 90mm Pulley
(28).Attach the Pulley inside of the Swivel Arm
(22)with an M10 x 42mm Button Head Bolt (71) and an M10 Nylon Locknut (76).
20 |
|
|
|
| 3 |
| 28 |
|
|
| |
40 |
|
| 76 |
|
|
| |
|
|
| 29 |
|
|
| 80 |
|
|
| Flat |
|
|
| Edge |
21 |
|
|
|
| 44 |
|
|
| 74 |
| 74 |
| 94 |
| 76 |
24 |
| 76 | |
|
| ||
|
|
| |
| 71 |
|
|
|
| 28 | |
|
|
| 80 |
22 |
|
|
|
| 28 |
| 29 |
|
|
| |
80 |
|
| 76 |
|
|
| |
| Flat |
| |
| Edge |
| |
|
|
| 73 |
23 |
|
|
|
|
|
| 71 |
| Rod | 22 | 104 |
|
| ||
|
|
| |
80 |
|
|
|
| 28 | 76 | 11 |
|
| ||
|
|
|
11