11.Insert the Resistance Bar (9) between the Crossbar Guides (15), and center it on the Crossbar Block (not shown).

Press a Pulley Bracket (10) onto the Resistance Bar (9). Screw a 3/8” x 38mm Tension Screw

(117)into the Pulley Bracket a couple of turns.

Make sure the hexagonal hole in the Screw is on the outside of the Bracket.

Attach a Tether (70) to the Pulley Bracket (10) at the upper hole, with an M10 x 64mm Button Bolt (80), an M10 Thick Washer (54), and an M10 Nylon

Locknut (103).

Repeat on the other side of the Resistance Bar (9). Then, tighten the lower M10 x 152mm Bolt (86) used in step 10.

12.Hold a Large Pulley (14) inside the upper cable

(A). Attach the Pulley to a Pulley Bracket (10) with an M12 x 58mm Button Bolt (87) and an M12 Nylon Locknut (13). Make sure that the cable is routed as shown in the CABLE DIAGRAM on page 19.

13.Hold a Large Pulley (14) inside the upper cable

(A). Attach the Pulley to the other Pulley Bracket (10) with an M12 x 58mm Button Bolt (87) and an M12 Nylon Locknut (13). Make sure that the cable is routed as shown in the CABLE DIA- GRAM on page 19.

Tighten the two 3/8” x 38mm Tension Screws

(117) an equal number of turns.

14.Attach the Leg Lever (56) to the Leg (5) with a Leg Station Pin (60). Slide a Cotter Pin (113) onto the Leg Station Pin.

11

 

 

15

 

 

 

 

70

 

 

103

 

9

54

 

 

 

 

10

 

 

80

 

 

117

12

 

 

13

 

 

10

 

 

87

 

 

14

 

 

A

 

 

13

 

 

 

 

13

A

 

117

 

10

 

 

87

 

14

14

 

 

5

 

 

56

 

 

 

 

113

 

 

60

10

Page 10
Image 10
Weider WESY78732 user manual