Manuals
/
Weil-McLain
/
Household Appliance
/
Boiler
Weil-McLain
550-141-826/1201 manual Install Packaged Boiler CONTINUED
Models:
550-141-826/1201
1
7
32
32
Download
32 pages
34.89 Kb
4
5
6
7
8
9
10
11
<
>
Install
Parts list
Dimension
Maintenance
Connect Wiring
Symbol Definitions
Precautionary measures
Page 7
Image 7
Install Packaged Boiler
CONTINUED
Change From Back Flue Outlet to Top Flue Outlet (Optional)
FIGURE 2
7
Page 6
Page 8
Page 7
Image 7
Page 6
Page 8
Contents
WGO SERIES 3 OIL-FIREDNATURAL DRAFT WATER BOILER
This Manual Includes Installation Start-Up
Boiler Parts
Part No. 550-141-826/1201
Hazard Definitions
Symbol Definitions
When Calling or Writing About the Boiler
Read This Page First
Install Packaged Boiler
Table of Contents
Table of Contents
Before Installing Boiler
Provide clearances around boiler see FIGURE
Before Installing Boiler
Installations must comply with
Before selecting boiler location
Do not install exhaust fan in boiler room
Before Installing Boiler CONTINUED
Go to page 6 to install boiler
Go to page 8 to install boiler
Go to page 12 to connect breeching and venting
Install Packaged Boiler
Place boiler
Perform hydrostatic pressure test
Install Packaged Boiler CONTINUED
First aid measures
Install Non-PackagedBoiler
Precautionary measures
Fiberglass wool and ceramic fiber materials
Install Non-PackagedBoiler CONTINUED
CONTROL TAPPING TABLE
Install Packaged and Non-PackagedBoiler
Install jacket sizes 7 through 9 only
Install boiler controls
Install Packaged and Non-PackagedBoiler
MINIMUM CHIMNEY SIZE TABLE
Connect Breeching
General chimney requirements
Connect breeching
Back Outlet Breeching Connection FIGURE
Connect Breeching
CONTINUED
Flue Pipe Bracket one on each side of pipe
DIAPHRAGM expansion tank FIGURE
Install piping
Connect Water Piping
General piping information
Connect Water Piping CONTINUED
Connect Water Piping CONTINUED
Piping MULTIPLE ZONES
3.Zoning with circulators
4.Zoning with zone valves
Connect Water Piping CONTINUED
Connect Water Piping
Use with refrigeration systems
Burner wiring
Connect Wiring
General wiring requirements
Thermostat wiring
Boiler Wiring for Forced Hot Water FIGURE
Connect Wiring
Limit Control Wiring Harness Circulator Wiring
Service Switch On Boiler Burner Wiring Harness
CONTINUED
Connect Wiring
General oil piping requirements
Connect Oil Piping
Oil piping connection at burner
To place in operation
Start-Up
Fill the system
Tips for water systems
Check-outprocedure has been performed
Check-OutProcedure
Installation and Service Certificate
Installation instructions have been followed
Appendix
Burner adjustments for “P” and “A” boilers
Appendix
Close clearance installation
Combustible Surface A 6 Protection
Appendix
W-MSales
Parts List
Description
C L M P
Parts Drawing
D E G H G
F Q B A K
DIMENSIONS - in
Dimensions
DIMENSIONS - mm
158.8
Dimensions
CONTINUED
177.8
WGO GOLD OIL WATER BOILER RATINGS
Ratings