Install Packaged and Non-Packaged Boiler

Install Packaged and Non-Packaged Boiler

Perform hydrostatic pressure test:

1.See FIGURE 4 and Control Tapping Table below to install:

a.Boiler drain.

b.Water pressure gauge (test only). Be sure gauge can handle test pressure.

c.Air vent in upper “N” tapping.

d.Plugs in remaining tappings.

2.Fill boiler. Vent all air. Pressure test boiler at 1 times working pressure. For boilers split and reassembled, test between 75 and 85 psig.

Do not leave boiler unattended. Cold water fill could expand and

damage cast iron, resulting in severe personal injury, death or substantial property damage.

3.Check for maintained gauge pressure for more than 10 minutes. Visually check for leaks if gauge pressure drops.

4.Drain boiler. Repair leaks if found.

Do not use petroleum-based compounds to repair leaks.

Damage to system components can result, causing property damage.

5.Re-test boiler after repairing leaks.

6.Remove pressure gauge, air vent and plugs from tappings used for controls.

E3

N

 

C

 

 

 

 

 

 

 

 

 

 

 

L

R1 Install jacket (sizes 7 through 9 only):

Install boiler controls:B1 HCONTROL TAPPING TABLE

7.Visually check:

a.Sealing rope placement.

b.Metal-to-metal contact around port openings.

c.Flue collector hood seal.

d.Burner mounting door seal.

Obtain gas-tight seal to prevent possible flue gas leakage and

carbon monoxide emissions, which can lead to severe personal injury or death.

Install jacket (sizes 7 through 9 only):

Before installing jacket, remove burner mounting door. See jacket instructions for details.

Install boiler controls:

See Control Tapping Table and FIGURES 4 and 5 to install controls.

1.Install limit control. If not furnished, use high limit with maximum 220°F setting.

2.Affix CP number label(s) on jacket front panel.

CONTROL TAPPING TABLE

LOCATION

SIZE

FUNCTION

 

 

 

B1

1½"

Return Piping

B2

1½"

Alternate Return Piping

for A/B WGO

 

 

C

1½"

Supply Piping

E3

¾"

Pressure-Temperature Gauge

H

¾"

Drain Valve

L

¾"

High Limit Control

N

½"

Air Vent or

Expansion Tank Piping

 

 

R1

¾"

Relief Valve

 

 

 

B2

Front Section

Back Section

 

Control Tapping Location

 

FIGURE 4