Install Non-Packaged Boiler CONTINUED
3.
Obtain
carbon monoxide emissions, leading to severe personal injury or death.
a.Thread tinnerman clip on screw so that clip fits snugly in notch of
b.Remove paper on sealing rope. Starting at back section near flue collar, position sealing rope around top of block with adhesive side to sections. Do not stretch rope. Make sure rope ends meet. Trim excess rope.
c.Position flue collector hood on top of boiler sections and over screws and clips as shown in FIGURE 3.
Nut
Washer
Tinnerman
Clip
|
|
|
|
|
|
|
|
|
|
|
|
|
| Sealing Rope in | |
|
|
|
|
| Groove Inside Cap | ||
Screw |
|
|
|
| |||
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
| Lug |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d.Install washers and nuts. Tighten nuts until collector hood makes contact with tinnerman clip.
e.Back flue outlet boiler — Position flue cap and strap over opening in flue collector hood. Make sure rope in cap is in place and in good condition. Tighten strap to hood with screws provided.
Top flue outlet boiler — Position flue cap and strap over opening in back section. Make sure rope in cap is in place and in good condition. Tighten strap to boiler with screws provided in section. Install remaining screws in holes in flue collector hood.
4.Check level. Shim legs, if needed.
Flue Collector
Hood
Sealing Rope with Adhesive Tape
Flue
Cap
Flue Cap
Strap
Change From Back Flue Outlet to Top Flue Outlet (Optional)
FIGURE 3
9