Weil-McLain Boiler Additional instructions, Air for boiler room ventilation, Wiring

Models: Boiler

1 16
Download 16 pages 24.97 Kb
Page 16
Image 16
Additional instructions

Air for boiler room ventilationWiringWater treatmentGAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems

Additional instructions

Air for boiler room ventilation

1.Follow instructions in Ultra Boiler Manual to ensure the boiler room provides sufficient air infiltration.

Wiring

1.Refer to boiler sequencing control instructions and Ultra Boiler Manual for wiring re- quirements.

Water treatment

Multiple boilers used with large water volume systems will require water softening and conditioning. Consult a local water treatment company prior to installation for analysis and recommendations.

Initial fill water may contain enough minerals to produce damaging deposits. Additional untreated makeup water will increase scale buildup.

Contamination may also come from scale and rust buildup inside the piping and heat distribution units of an older boiler system replaced with small multiple boiler units. The result can lead to loss of efficiency and component failure.

1.Follow proper start-up procedure for flushing any contaminants from the entire system before initial fill.

2.Hot water systems should not require makeup water after initial fill. Use manual feed water systems or install a water meter to detect leaks.

3.Repair leaks — constant fill water will cause problems.

4.Refer to Ultra Boiler Manual for more information.

16

Part number 550-101-232/0703

Page 16
Image 16
Weil-McLain Boiler installation manual Additional instructions, Air for boiler room ventilation, Wiring, Water treatment