Weil-McLain GV90+ Perform maintenance per schedule below, start-up, Service technician, Daily

Models: GV90+

1 16
Download 16 pages 19.78 Kb
Page 5
Image 5
Perform maintenance per schedule below

GV90+ gas-fired water boiler — User’s Information Manual

Perform maintenance per schedule below

Figure 2 Service and maintenance schedules

Service technician

(see Boiler Manual for instructions)

start-up

Follow the procedures listed in

Annnual

the Boiler Manual.

 

Owner maintenance

(see following pages for instructions)

 

• Check boiler area

Daily

• Check air openings

 

• Check pressure gauge

 

 

 

• Check boiler interior piping

 

• Check venting system

Monthly

• Check air vents

 

• Check condensate drain system

 

• Check relief valve

 

 

Periodically

• Test low water cutoff (if used)

• Clean vent termination/air intake

 

screens

 

 

Every 6 months

• Oil blower motor

• Operate relief valve

 

End of season

• Shut down procedure

Part number 550-142-055/0411

5

Page 5
Image 5
Weil-McLain GV90+ Perform maintenance per schedule below, start-up, Service technician, Follow the procedures listed in