GV90+
Perform maintenance per schedule below
Figure 2 Service and maintenance schedules
Service technician
(see Boiler Manual for instructions)
| Follow the procedures listed in | |
Annnual | ||
the Boiler Manual. | ||
|
Owner maintenance
(see following pages for instructions)
| • Check boiler area | |
Daily | • Check air openings | |
| • Check pressure gauge | |
|
| |
| • Check boiler interior piping | |
| • Check venting system | |
Monthly | • Check air vents | |
| • Check condensate drain system | |
| • Check relief valve | |
|
| |
Periodically | • Test low water cutoff (if used) | |
• Clean vent termination/air intake | ||
| screens | |
|
| |
Every 6 months | • Oil blower motor | |
• Operate relief valve | ||
|
End of season
• Shut down procedure
Part number | 5 |