
GOLD GV Series 3 & 4 —
Installation — assembly
Connect vent starter tee to boiler
Follow the instructions in the GV Boiler Manual to connect the vent starter tee to the boiler.
Construct vent and optional combustion air run
Follow vent pipe manufacturer's instructions for sealing the vent. Vent and combustion air connector piping must be sealed
1.Follow
•Clean joints before sealing. See vent pipe manufacturer's instructions to clean joints.
•Use their specified sealant (maximum 250 °F flue temperature). Do not use screws.
•Do not mix types or manufacturers of vent materials.
•Maintain minimum
•Install vent pipe with seams on top of vent runs.
•If needed, male end of vent pipe may be cut to provide correct length. See vent pipe manufacturer's instructions for use.
2.If installing with direct vent through sidewall method, use instructions provided with
Connect vent run to termination
Venting through sidewall
1.If using
2.If using
•If passing through noncombustible wall, provide hole diameter large enough to insert the slip connector through. Sleeve and spacers are not required.
3.Maintain minimum
4.Refer to vent termination WARNING, item 19 on page 3.
Venting through existing chimney or roof
1.Direct vent method — follow instructions supplied in
2.
•Vent pipe must extend through roof flashing, jacket or thimble. See Figure 10.
•Vent may pass through floor, inside wall or concealed space when installed according to vent pipe manufacturer's instructions.
2.Maintain minimum
6 | Part number |