GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement

Installation — assembly continued

Figure 8 Sidewall termination installation (non-direct venting)

¼ " to ¾ " between stop on termination and metal plate

Spacers (2)

(to support and center vent in sleeve)

 

Pipe section

 

4" galvanized sleeve

 

(through 4¹⁄₈" hole for

 

combustible wall)

 

Metal plate

Metal plate

Spacers (2)

 

(to support and

 

center vent in

 

sleeve)

 

Pipe section

 

 

 

Sealant

Sealant

 

 

 

 

 

Termination coupling

26609

Figure 9

Non-direct vent through sidewall

Figure 10

Non-direct vent through roof

(using termination coupling) Follow Z-Vent II manufacturer’s instructions for proper installation of vent runs, including slope and support.

Follow Z-Vent II manufacturer’s instructions for proper installation of vent runs, including slope and support.

Z-Vent II

vent starter tee

 

Z-Vent II

 

vent starter tee

26604b

26605b

Part number 550-110-266/0601

7

 

Page 7
Image 7
Weil-McLain GV Series 4, GV Series 3 manual Vent