GOLD GV Series 3 & 4 —
Installation — assembly continued
Finish the vent installation
Installing condensate tubing
1.See Figure 11 to install condensate tubing (provided by others). Use condensate pump if floor drain is higher than condensate drain on boiler.
If required:
•use a
•set boiler on foundation (see GV Boiler Manual) to allow gravity flow to discharge.
2.Size pump in gal/hr (boiler model):
•0.78
•1.17
•1.56
•1.95
Refer to pump manufacturer's instructions. Drain to a
Figure 11 Installation of condensate tubing
|
|
Vent | vent starter tee |
|
5/8" O.D. tubing, | 26606 | |
provided by | ||
| ||
others |
|
If vent pipe or combustion air pipe must be reassembled
When vent pipe or combustion air pipe is disconnected for any reason, it must be reassembled and resealed according to this Venting Supplement, the direct vent termination kit instructions and the vent pipe manufacturer's instructions.
Sealant recommended by vent pipe manufacturer must be used as indicated in their instructions. Vent and combustion air connector piping must be sealed
8 | Part number |