ASSEMBLY |
|
|
|
|
|
|
|
4. Attach Upper Post (F) to Lower Post (H) by screwing the two pieces of the post |
|
|
|
4 |
|
| |
together. |
|
|
|
|
|
|
|
5
5.Place Tank Housing (D) onto Base (J). Slide Tank Housing (D) over the assembled Upper/Lower Post and down over the Post Supports. Rest Tank Housing on Base.
6. Attach Head Assembly (C) to Upper Post (F). | 6 |
|
Note: There is a small piece of protective foam located in the |
|
|
neck of the Head Assembly that MUST be removed prior to |
|
|
attaching Head Assembly to the Upper Post. |
|
|
Route Gas Hose (E) down into Upper/Lower post assembly and |
|
|
align 4 small holes on Head Assembly with 4 Small holes in Upper |
|
|
Post(F). |
|
|
[HINT: Control knob should be above decal on post.] |
|
|
Insert 4 M6x10 (FF) bolts through 4 M6 lock washers into holes and |
|
|
tighten. |
|
|
Hardware Used: 4 x FF, Bolt M6x10 and Lock Washer M6 |
|
|
|
|
|
- | 7 - |