2. Identify the Left Upright (3), which has the | 2 |
|
Upright Wire (46) inside. Orient the Left Upright |
| |
|
| |
as shown, and attach it to the left Upright Base | 46 |
|
(16) with two M10 x 55mm Screws (13), four |
| |
|
| |
M10 Washers (14), and two M10 Nuts (18). Do |
|
|
not tighten the Nuts yet. |
|
|
Attach the Right Upright (9) to the right Upright |
|
|
Base (16) in the same way. Do not tighten the | 3 |
|
Nuts yet. |
| |
|
| |
| 13 |
|
| 13 | 9 |
| 14 |
|
| 14 |
|
|
| 13 |
| 14 | 13 |
| 14 | |
| 18 | 14 |
| 16 |
|
| 16 | 14 |
|
| 18 |
3. Slide the ends of the Handrail (5) into the tubes | 3 |
|
on the Left and Right Uprights (3, 9). If neces- |
| |
4 |
| |
sary, use a rubber mallet to fully insert the |
| |
|
| |
Handrail. Attach the Handrail with two M6 x |
|
|
15mm Screws (4). |
|
|
Connect the Upright Wire (46) to the Handrail | 49 |
|
| 5 | |
Wire (49). | 46 | |
|
| |
| 3 |
|
|
| 4 |
|
| 9 |
| 5 |
|