![Wall Hanging Installation](/images/new-backgrounds/55535/5553523x1.webp)
Wall Hanging Installation
For a wall mount installation, use
Locate the heater as desired, but follow all applicable local codes, as well as the indoor or outdoor clearances that apply to the installation.
Standing Installation
If the unit is to be installed standing on a surface, adjust the legs so that the unit stands securely and is level (legs can be adjusted up to 1”).
Do not install the unit standing directly on a
combustible surface. Use a 3” non- combustible base.
Use the included L brackets to connect the unit to a wall to ensure that it does not fall over. These brackets will maintain the required 1” clearance between the back of the unit and a combustible surface.
Outdoor Installation
Follow all local codes, or in the absence of local codes, follow the codes for Installation of Gas Burning Appliances; National Fuel Gas Code ANSI Z221.23 in USA or CAN/CGA B149.1 or .2 in Canada.
For outdoor installation, purchase a
Set the dipswitches for an outdoor installation (See pgs.
Locate the water heater in an open, unroofed area, and maintain the following minimum
clearances from combustible and noncombustible materials.
Outdoor Clearances
Piping side | 6” |
Front (Maintenance | 24” |
space) |
|
Floor | Non combustible |
| base Min. 3” off the |
| ground |
Back of heater | 1” |
Non piping side | 2” |
Top of heater | 36” |
If this unit is installed under an overhang, there must be a 36” clearance from the top of the unit to the overhang, and the surrounding area must be open in front and on the sides of the unit.
WARNING: Do not have the flue terminal pointing toward any opening into a building. Do not locate your heater in a pit or any location where gas and water can accumulate.