Specifications LükWerks User Guide
86
Wall and Ceiling Mount Installation Installing the Luk Camera Wall and Ceiling Mount is simple. Use the recommended tools and drilling template
below. As always, use caution to avoid injury.
Recommended tools: Screwdriver, electric drill.
Surface Pilot Hole Drill Size Pilot Hole Depth
Softwood 1.6 mm (1/16”) 1.2 cm (1/2"0
Hardwood 2.0 mm (5/64”) 1.2 cm (1/2")
Wallboard (use anchor) 5.0 mm (3/16”) 2.3 cm (7/8”)
Pre-drill pilot holes before securing the camera to the surface. For soft, hollow surfaces such as wallboard,
sheet rock and drywall, use the provided plastic anchors.
WALL MOUNTING DRILLING TEMPLATE
The illustration is drawn to a one-to-one scale, which means it provides the exact dimensions required to
mount the unit.
Drill Holes in
These Positions