SERVICE SCHEDULE

Before

Starting

the Work

Period

End of Work

Period

Before

Storing

Maintenance Item

Check Battery water level

Check Vac Hose Connections

Clean the Squeegee Blades

Inspect Brushes or Pads for debris ie: wire, string, wear Inspect Vac fan shut off float screen

Drain & Rinse Tanks

Raise Squeegee Assembly

Raise Scrub Deck Assembly

Charge the Batteries

Remove the Pad Drivers/Brushes

Check the Brushes/Padsfor Damage and or wear Clean Squeegee blades

Clean recovery tank vac shutoff & screen

Check Battery Cells w/Hydrometer

Check Solution Strainer

Check Pivot Points, Caster, and Squeegee for proper lubrication Inspect tank and hoses

Clean tops of Batteries and Tray

Check Battery Cable Clamps

Use a Vacuum to remove lint from the motor windings Grease Squeegee pivot and Casters

Inspect all Motors for Carbon Motor Brush Wear.

Daily

*

*

*

*

*

*

*

*

*

*

*

*

*

Weekly Monthly Annually

*

*

*

*

*

*

*

*

*

14

SABER/STRIDE II 28/34 98570 5/1/98

Page 14
Image 14
Windsor QQS34SP, QQS28 operating instructions Service Schedule, Before Starting Work Period End of Work Storing