Attach Top Link to Backhoe
1. Attach top link (1) to the main frame using two | 1. 1017875 | Top link | ||
cap screws (7), four hardened flat washers (16), | 2. | 37670 | Double top link | |
and two hex nuts (8). | 7. | 14334 | 3/4 NC x 3 HHCS GR5 | |
| ||||
2. Slide double top link (2) over top link (1) and | 8. | 1450 | 3/4 NC Hex nut | |
secure using two cap screws (10) and lock huts | 10. | 34157 | 7/8 NC x | |
(12). See Figure 3. | ||||
12. | 34194 | 7/8 NC Lock nut | ||
| ||||
NOTE: To estimate the overall length of the two | 16. | 57798 | 3/4 Hardened flat washer | |
top link bars; roughly measure from the center of |
|
|
| |
the tractor top link bracket to the center of the |
|
|
| |
lower |
|
|
| |
Final adjustment will be made when backhoe is |
|
|
| |
attached to tractor. |
|
|
|
Figure 3. Top Link Installation
6 Installation | MAN0549 (6/30/2006) |
|
|