4. Finish securing chute control assembly to chute support bracket with wing nut and hex screw removed earlier. See Figure 3-4.

Figure 3-4

5. Check that all cables are properly routed through the cable guide on top of the engine. See Figure 3-5.

The extension cord is fastened with a cable tie to the rear of the auger housing for shipping purposes. Cut the cable tie and remove it before operating the snow thrower.

CAUTION: Prior to operating your

 

snow thrower, refer to Auger Control

 

Test on page 13. Read and follow all

 

instructions carefully, and perform all

 

adjustments to verify your snow thrower

Figure 3-5

is operating safely and properly.

 

Shear Pin Storage (optional)

An area for convenient shear pin storage is located under the plastic dash panel. See Figure 3-6.

Figure 3-6

3

Setting Up

Your Snow

Thrower

CAUTION

Prior to operating your snow thrower, refer to Auger Control Test on page 13. Read and follow all instructions care- fully and perform all adjustments to verify your unit is operating safely and properly.



Page 7
Image 7
Yard-Man 769-03245 warranty Setting Up Your Snow Thrower, Shear Pin Storage optional