Unpacking
Before installing the machine the packing and transit bolts must be removed. The transit packaging is red for ease of identification. Please retain the packing and transit bolts for
Unpack the appliance. Tilt the appliance backwards. Remove the polystyrene base, by turning the appliance one quarter turn.
Remove the base (fig. 1).
Open the lid and remove the polystyrene block and wedges securing the drum.
Close the lid (fig. 2).
Using a spanner, remove the two transit bolts (A) (fig. 3).
The holes which are now visible must be filled with the plugs (B) provided (fig. 4).
Retain the polystyrene block and transit bolts for future use (fig. 5).
To enable the appliance to be pushed further into the recess, the plastic crossbar holding the hoses at the back of the appliance can be cut off (fig. 6).
Positioning
The installation surface must be clean dry and level
Do not install on deep pile carpet.
Do not install the appliance in locations where the temperature may fall below freezing Please ensure that when the appliance is installed it is easily accessible for the engineer in the event of a breakdown
Fig. 1
A
Fig 3
Fig 5 |
Fig. 2 |
B |
Fig 4 |
Fig 6 |
21