Zanussi ZGF 682 Building In, Building over a cupboard or drawer, Fitting the Hob into the worktop

Models: ZGF 682 ZGF 692

1 16
Download 16 pages 20.1 Kb
Page 11
Image 11
Building In

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

It is also recommended to carry out the electrical connection to the hob as shown in diagrams 1 and 2.

1

FO 0763

2

FO 2564

3

FO 2044

Building over a kitchen unit with door

Proper arrangements must be taken in designing the furniture unit, in order to avoid any contact with the bottom of the hob which can be heated when it is operated. The recommended solution is shown in diagram 3.

The panel fitted under the hob ("a") should be easily removable to allow easy access if technical assistance is needed. The space behind the kitchen unit ("b") can be used for connections.

Fitting the Hob into the worktop

)Carry out the building in of the hob as follows:

place the seals supplied with the hob on the side edges of the cut out and at 8 mm from the front and rear edges, as shown in the diagram, taking care that the seals meet without overlapping;

place the hob in the cut out, taking care that it is centred;

fix the hob with the relevant fixing clamps and screws, as shown in the diagram. When the screws have been tightened, the excess seal can be removed.

The edge of the hob forms a double seal which prevents the ingress of liquids.

Dimensions are given in mm.

Seal

FO 0199

11

Page 11
Image 11
Zanussi ZGF 682, ZGF 692 Building In, Building over a cupboard or drawer, Building over a kitchen unit with door, Seal