6. Set up (BCZ2500S, BCZ2500SU)

SE1

MOUNTING ENGINE (SE1)

1.

Push the driveshaft housing toward the clutch

 

 

 

housing and rotate it by hand to check that the

 

 

driveshaft is engaged with the gears.

 

2.

Insert the driveshaft housing into the clutch

 

 

housing until it bottoms, and align the positioning

 

 

holes on the clutch housing and the shaft tube

 

 

and install the screw. When difficult to engage,

 

 

twist the engine slightly.

 

3.

Fasten the clamp securely with two screws.

SE2

 

 

IMPORTANT

Tighten the screws gradually by turns.

CONNECTING THROTTLE WIRE

1. Remove the air cleaner cover.

2. Connect the end of the throttle wire to the joint on the top of the carburetor. (SE2)

SE3

(1)

SE4

(1)

(2)

(3)

CONNECTING SWITCH WIRES

Connect the switch wires between the engine and the main unit. Pair the wires of the same color.

INSTALLING HANDLE

Mount the handle to the shaft tube and clamp it at a location that is comfortable to you. (SE3)

(1) About 19 inches (48cm)

INSTALLING DEBRIS GUARD

Put the debris guard on the gear box, attach it with the 4 screws and hardware provided. (SE4)

(1)debris guard

(2)plate

(3)screw

13

Page 13
Image 13
Zenoah BCZ2500SW, BCZ2500SU manual  13 