Zenoah BCZ2500SU manual SE6, SE7 SE8 SE9 Mounting Engine SE5, Putting on Waist PAD,  14 

Models: BCZ2500SW BCZ2500SU BCZ2500S

1 42
Download 42 pages 10.53 Kb
Page 14
Image 14

6.Set up (BCZ2500SW)

SE5

SE6

SE7

SE8

(1)

(2)

SE9

MOUNTING ENGINE (SE5)

1.Push the driveshaft housing toward the clutch housing and rotate it by hand to check that the driveshaft is engaged with the gears.

2.Insert the driveshaft housing into the clutch housing until it bottoms, and align the positioning holes on the clutch housing and the shaft tube and install the screw. When difficult to engage, twist the engine slightly.

3.Fasten the clamp securely with two screws.

IMPORTANT

Tighten the screws gradually by turns.

INSTALLING HANDLE

Mount the handle to the shaft tube and clamp it at a location that is comfortable to you. (SE6)

(1) About 14.5 inches (37cm)

CONNECTING THROTTLE WIRE

1. Remove the air cleaner cover.

2. Connect the end of the throttle wire to the joint on the top of the carburetor. (SE7)

CONNECTING SWITCH WIRES

Connect the switch wires between the engine and the main unit. Pair the wires of the same color. (SE7)

PUTTING ON WAIST PAD

Wrap the waist pad around the shaft tube and the throttle wire. (SE8)

(1)Waist Pad

(2)Band

INSTALLING DEBRIS GUARD

Put the debris guard on the gear box, attach it with the 4 screws and hardware provided. (SE9)

(1)Debris guard

(2)Plate

(3)Washer

(4)Screw

14

Page 14
Image 14
Zenoah BCZ2500SU, BCZ2500SW manual SE6, SE7 SE8 SE9 Mounting Engine SE5, Putting on Waist PAD,  14 