6. Set up

SE10

SE11

INSTALLING CUTTING HEAD (SE10)

1.While locking the gear shaft, by inserting the supplied tool into the upper holder on the gear box, loosen and remove the hexagon nut(left- handed)

2.Fit the holder attached to the upper holder. Then screw in the cutting head to the gear shaft over the holders. Hand-tighten it securely.

BALANCE UNIT

1.Put on strap and attach unit to strap.

2.Slide clamp up or down until unit balances with head just touching on the ground. (SE11)

15

Page 15
Image 15
Zenoah BCZ2500SW, BCZ2500SU manual Set up, SE10 SE11, Installing Cutting Head SE10, Balance Unit,  15 